Targets and milestones

Set a target for your work package, break it into milestones and connect the measures that deliver it, so progress updates on its own.

Who can do this

  • Project Leads, Work Package Leads and Consultants can create and edit targets.

  • Project Leads and Consultants can delete a target.

  • Contributors and Guests can see targets but can’t change them.

When to use

Use a target to agree what a work package has to achieve, for example “Reduce scrap by 12% by the end of March”. Break it into milestones when the work happens in stages, and connect the measures that deliver it, so your target shows real progress rather than a guess. Targets say where you need to get. KPIs track how you’re getting there.

Find your targets

  • Open your work package. Your targets sit in Targets for Handover on the Onepager.

  • Use Filter to show All, Not started, Open or Completed targets.

  • Each target card shows its milestones. Click a target to open it.

  • The same targets show in the Work Package Agreement, in your Inbox notifications and on the Targets slide of your reports.

Create a target

  • In Targets for Handover, click Add. If there are no targets yet, click Add targets.

  • Name your target, for example “Reduce scrap on line 3”.

  • After a moment, Antonella shows Suggestions under the name, such as “Your target is to reduce scrap by 12%”. Click one to use it, and the calculation is filled in for you.

  • Add a comment if the team needs context.

  • Set the dates with Add start date and Add due date. Both are optional, but a due date gives the team a clear finish line. The due date can’t be before the start date.

  • Click Create. To add several targets in a row, switch on Create more first.

Start from a roadmap

  • Some of Antonella’s suggestions have a small arrow next to them. It appears when similar targets have been reached before.

  • Click the arrow to see a rough plan: how many similar targets it’s based on, roughly how many weeks and measures they took, and the phases they went through. Each phase shows its weeks, what it was for and example measures. Under “What made these work” you’ll find what helped those targets succeed.

  • Click Use target + roadmap to use the suggestion and add each phase as a milestone. Each milestone’s due date is counted from your target’s start date, or from today if you haven’t set one. You can change or delete the milestones afterwards.

  • The example measures aren’t added for you. Create the measures you need and connect them to the milestones.

Set the calculation

  • Switch on Calculations to make the target measurable.

  • Choose a Function (Reduce or Multiply), type a Category (for example Scrap, Coverage or PPM) and enter a Value. Pick the value type next to it: Percentage, Absolute, Euro or US Dollar.

  • A sentence above the fields reads your target back as you fill it in, so you can check it says what you mean.

Break a target into milestones

  • In the target window, click Add dependency.

  • Click Add milestone. Name it, add a short description if helpful, and set a due date with Add due date. Milestones have a due date but no start date. The due date can’t be before the target’s start date.

  • Add as many milestones as the plan needs. Use the milestone’s menu to Duplicate it or Delete milestone.

  • Click Confirm to keep your changes, or Back to leave without them.

Connect the measures that deliver it

  • In the same view (Add dependency), select measures from your work package on the left.

  • To select several measures at once, tick the first one, then hold Shift and tick the last one.

  • Click Connect to link them to the target. Click Move to milestone to put them under a milestone, or drag a measure onto one.

  • Measures you connect without a milestone sit under No milestone. They still count towards the target.

  • You can also connect a measure from the measure itself. In the measure, click Connect target and pick the target, then Add milestone to put it under a milestone. A measure connects to one target.

Watch progress update

  • Each milestone and the target show how many of their measures are done.

  • Once measures are connected, the target’s status follows them, so you no longer set it by hand.

  • In the measure table, each measure shows its milestone under its title.

Complete, change or delete a target

  • Click the target to open it. Change anything you need, then click Confirm.

  • To mark it completed, set its status to Completed. If measures are connected, the status follows them instead.

  • Project Leads and Consultants can delete a target with Delete target. elyvate asks you to confirm first.

Troubleshooting

  • I can’t change the target’s status. Once measures are connected, the status follows them. Disconnect the measures if you need to set it by hand.

  • Antonella isn’t suggesting anything. Suggestions appear once the name has at least two words and one of them is four letters or longer. Give it a second after you stop typing.

  • I deleted a milestone. Where did its measures go? They stay connected to the target and move to No milestone.

  • I can’t add or change targets. Targets are read-only on archived work packages and when you’re looking at a past week. Contributors and Guests can see targets but can’t change them.

  • I can’t pick the date I want. A target’s due date can’t be before its start date, and a milestone’s due date can’t be before the target’s start date. Change the start date first if you need an earlier date.