The work package Onepager

The Onepager is the page you land on when you open a work package: its status, next report date, Weekly Progress, targets, Top KPIs and measures in one view.

When you open a work package, you land on its Onepager. It brings the work package’s status, report date, Weekly Progress, targets, Top KPIs and measures together in one view, so the team and leadership see where things stand at a glance.

The tabs

  • Onepager: the page described here. It opens whenever you open a work package.

  • KPI Collection: all the work package’s KPIs (see Create KPIs). Internal work packages don’t have this tab.

  • Details: the button next to the tabs opens Work Package Details (see WP Details).

The report bar

At the top of the work package, above the tabs:

  • Next Report: shows when the next work package report is due.

  • As the date gets close (within 48 working hours), a countdown appears next to it, and a banner reminds you that your work package report is due. The banner turns red in the last 12 hours. Close it with its X. It comes back if the due date changes or it turns red.

  • Once the report is overdue, the banner says how long ago it was due, for example “Your work package report was due 14 days ago”.

  • Once your report has been submitted, SENT FOR REVIEW shows next to the date.

  • Send opens the window to submit your report to the Project Lead. After you’ve sent it, the button reads Update, so you can still make changes (see Create your work package report). Work Package Leads, Project Leads and Consultants can send, but Guests can’t.

  • Project Leads and Consultants can change the report date with the button next to it.

  • Archived and internal work packages don’t have a report bar.

Work package status

  • Three traffic lights show the work package’s status for Last week, the Current week and Next week. The Next week light is your prognosis.

  • Green means On track. Yellow means Deviated with counter measure. Red means Deviated, no counter measure.

  • To change it, click the update button next to the lights. In Update status and prognosis, set Last Week, Current Week and Next Week, then click Update. The options read On track, Deviated CM and Deviated NCM.

  • Work Package Leads, Project Leads and Consultants can change the status.

  • On a narrow window, only the Current light shows. Last and Next appear at normal width.

What’s on the Onepager

  • Weekly Progress (top left): this week’s update on the work package (see Weekly Progress).

  • Targets for Handover (top right): the work package’s targets and milestones (see Targets and milestones).

  • Top KPI’s: up to four starred KPIs. Use Display to switch between Small and Large. Work Package Leads and above can click Create KPI (see Favoriting KPIs and Create KPIs).

  • Measures: every measure in the work package, with search, filters and the Active and Archived switch (see Create, track and manage measures).

  • Internal work packages show only the measures.

Look back at earlier reports

  • Once the project has a generated report, a week picker appears at the top of the Onepager, showing This Week. Use the arrows to step back through past reports, or open the calendar, where dots mark weeks with a Report planned or Report sent, and click Confirm. Earlier weeks show their calendar week, for example CW 26.

  • While you’re looking at a past week, the report bar shows REPORT ON with that report’s date. Sending, changing the status and adding KPIs are switched off, and Weekly Progress and targets are read-only.

Best practices

  • Update the status every week, and keep it honest, so leadership knows where to help.

  • Write Weekly Progress before the report is due.

  • Star the three or four KPIs that best show how the work package is doing.