Who can do this
Work Package Leads and above can set up and edit the agreement.
Everyone else on the work package can read it.
Internal work packages don’t have an agreement.
When to use
The agreement is where a work package’s plan is agreed before the work starts: what it will deliver, what it won’t cover, and which other work packages it depends on. It sits in Work Package Details, next to the work. Your existing agreement content carries over, and the work package’s targets and Top KPIs show up in it automatically.
Set up the agreement
Open Work Package Details and click the Agreement tab.
If nothing has been set up yet, click
Get started.Choose how to start:
Upload PowerPoint: upload your agreement slides as a PowerPoint, PDF, JPEG or PNG, up to 25 MB. Antonella reads them and proposes the agreement for you to review.
Build from scratch: click
Create draftand fill in each section yourself.
Review what Antonella found
While Antonella reads your slides, you can close the progress window and keep working. Cancel it to go back and choose again.
Go through what she proposes: targets with their milestones, out of scope items, KPIs and dependencies. She turns handover criteria from your slides into targets.
When something is already on your work package, she says so and suggests merging into it. For each item, you can merge it, add it as a new item, or skip it.
Finish with the final review and confirm. If a few items can’t be added, elyvate tells you how many, and the rest are imported.
If you stop halfway, close the review and come back later to pick up where you left off. Your progress is kept on the same browser for 7 days, until you sign out.
What’s in the agreement
Targets for Handover: the work package’s targets, with their milestones and connected measures. Filter them by Not started, Open or Completed. If you can edit the agreement, click a target to open it. See “Targets and milestones” for how targets work.
Out of scope: what this work package doesn’t cover.
Dependencies: the other work packages this one depends on, or is required by.
Top KPIs: the KPIs starred as Top KPIs for this work package. To add one, click
Add KPI, finish it in the KPI wizard and come back to the agreement.
Edit and save your draft
Click
Edit draftto make changes, and useAddin each section to add items.Counters at the top show how many items are new and how many are updated since you last saved.
Click
Save and exitwhen you’re done.Discard changesundoes your edits to Out of scope and Dependencies. Targets and KPIs save as soon as you create or change them, so discarding doesn’t undo those.If you try to leave with unsaved changes, elyvate asks first. Choose
Save and continue,StayorExit without saving.
Export the agreement
In the current agreement, click the export button next to the title to download it as a PDF.
Troubleshooting
I can’t edit the agreement. Only Work Package Leads and above can edit it. Ask your Work Package Lead or Project Lead.
My unfinished import has gone. Imports in progress are kept on the browser you started them on for 7 days, and cleared when you sign out. Upload the slides again to start over.
Discard didn’t undo my new target. Targets and KPIs save straight away. Edit or delete the target itself.