Skip to main content

Weekly Progress

Write your work package Weekly Progress, let Antonella draft it for you, and look back at what was reported in earlier weeks.

Who can do this

  • Work Package Leads and above can write and update Weekly Progress.

  • Everyone on the work package can read it, including earlier weeks.

When to use

Weekly Progress is a short update on how the work package did this week. It appears on the work package’s Onepager, and it’s what the team and leaders read to keep up without opening every measure.

Add or update this week’s progress

  • Open your work package. Weekly Progress sits on the Onepager.

  • If nothing has been written yet this week, click Add or Create entry. Otherwise click Update progress.

  • Write your update in the editor and save it.

  • If you try to close the window with unsaved changes, elyvate warns you first. Click Discard to close without saving.

Let Antonella draft it

  • In the editing window, click Draft, or Update if there’s already text, and Antonella writes the update for you: a headline, a short overview, and sections for KPIs, targets and measures.

  • Her draft replaces what’s in the editor, so you can review and change it before saving.

  • Once you edit her draft yourself, the Draft button goes away, so your changes aren’t overwritten.

Auto summarize

  • With Auto summarize switched on, Antonella writes the week’s update for you when you open an empty week. While it’s on, the panel shows an AI generated summary tag.

  • She only does this for the current week, and only while the report isn’t overdue.

  • Switch Auto summarize off at the bottom of the editing window if you’d rather write it yourself. The setting is saved on your browser.

Look back at earlier weeks

  • Use the week picker at the bottom of the panel to go back to an earlier week. You can pick any week that has a saved version. The current week shows as This week.

  • Earlier weeks are read-only and show exactly what was reported, so they can’t be changed after the fact.

Who gets notified

  • When someone saves Weekly Progress, the Work Package Lead and Contributors get a notification. Antonella’s automatic summary doesn’t send one.

Troubleshooting

  • I can’t edit Weekly Progress. Only Work Package Leads and above can write it. Also check you’re on the current week: earlier weeks are read-only, and archived work packages can’t be edited.

  • Antonella didn’t write this week’s summary. Auto summarize only runs on an empty current week, while the report isn’t overdue, and only if Auto summarize is switched on.

  • I can’t find a week in the picker. Only weeks with a saved version can be picked.

Did this answer your question?